You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
GJC compatibility campaign: Rust fork-in-spirit of gajae-code #3319
Phase 1 is now effectively complete on the wire-protocol side: #3330 laid the frame/transport foundation, #3349 added reconnect/timeout/handshake/typed-error coverage, and #3351 delivered session lifecycle with reconciliation. That closes the first three checklist items; ready to move into Phase 2 tool-catalog completion.
Activity
XinwangTao commentedon Oct 13, 2026
Phase 1 is now effectively complete on the wire-protocol side: #3330 laid the frame/transport foundation, #3349 added reconnect/timeout/handshake/typed-error coverage, and #3351 delivered session lifecycle with reconciliation. That closes the first three checklist items; ready to move into Phase 2 tool-catalog completion.
docs: add GJC compatibility gap matrix